Hillsborough terminates coal-fired project

The British Columbia Environmental Assessment Office (EAO) has terminated the environmental assessment of the proposed 184 MW coal-fired Wapiti Power Development Project.

The termination occurred after EAO received a letter dated June 7 from the developer, Hillsborough Resources Limited, requesting that the proposed project be withdrawn from the environmental assessment process.

The project was originally proposed to the EAO in 2006.

Read more new coal-fired projects news

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...