Biomass project purchased by enXco

The purchase of the Pinelands Biomass Project from Southeast Renewable Energy, LLC (SRE), has been closed by enXco. The Pinelands project consists of two 17.8 MW generating facilities in South Carolina.

Both projects are currently under construction and expected to be fully operational by the end of 2013.

The two projects will interconnect to Santee Cooper's transmission system under 30-year power purchase agreements.

The projects will use a stoker boiler supplied by Factory Sales Engineering and a steam turbine generator supplied by General Electric (GE). Bibb Engineers is the engineer of record and Summit Industrial Construction is the general contractor.

 

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...