Wind power expansion project commemorated

First Wind celebrated the completion of its Steel Winds II expansion on Feb. 21. First Wind said with the Steel Winds II wind power project now in commercial operation, the 35 MW cumulative Steel Winds project will have help bring New York closer to its goal of 30 percent renewable energy sources by 2015.

Just south of Buffalo, N.Y., in the city of Lackawanna and town of Hamburg, the 20 MW first phase went online in June 2007. As part of the 15 MW expansion, First Wind installed six additional 2.5 MW wind turbines.

During construction of the expansion, for which TVIG was the general contractor, Steel Winds II created about 100 jobs.

Read more wind power news

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...