Wind power turbine orders won by Nordex

Nordex U.S.A. Inc. said it won two new orders from wind farm developer RPM Access LLC for the 37.5 MW Hawkeye Wind Farm and the 50 MW Rippey Wind Farm, both in Iowa. The new orders for 35 N100/2500 turbines increase Nordex' capacity in Iowa to 130 MW.

The power from the two new wind farms has been purchased by Central Iowa Power Co-op under a long term agreement.

Construction work for both locations has already begun with turbine delivery scheduled for May 2012 for Rippey and June for Hawkeye. Commercial operation for both projects is slated to begin by October 2012.

Read more contracts and projects news

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...