Biomass boiler equipment to be supplied by Metso

Metso will supply a 100 MWe biomass boiler island and plant automation system to the 100 MW Gainesville Renewable Energy Center (GREC) in Florida.

Metso will supply the boiler island and flue gas cleaning system along with the entire power plant automation system.

The biomass boiler will use bubbling fluidized bed (BFB) technology and use waste wood from logging and mill activity as well as wood waste from clearing, tree trimming and pallets as the main fuel.

GREC has raised $500 million in construction financing. The plant is expected to enter service in 2013.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...