Blue Canyon wind to use Vestas maintenance services

Vestas secured a service-contract extension for 10 years from EDP Renewables NA for the 225 MW Blue Canyon I and II wind power plants near Carnegie, Okla.

Click to Enlarge

Blue Canyon I includes 45 Vestas model NM72 wind turbines at 1.65 MW each that began producing energy in 2003. Blue Canyon II uses 84 V80 1.8 MW turbines and was completed in 2005.

The contract includes Vestas’ Active Output Management 4000 service option, which guarantees a defined turbine availability and productivity, as well as scheduled and unscheduled maintenance and replacement of major components and spare parts.

Read more wind energy news.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...