SunPower opens manufacturing facility solar plant funding

The 250 MW California Valley Solar Ranch was offered a conditional commitment for a loan guarantee of up to $1.187 billion from the U.S. Department of Energy (DOE).

NRG Solar, a unit of NRG Energy, will assume all ownership and financing for the project, which is subject to certain conditions. SunPower will design, construct and initially operate and maintain the plant.

The announcement came as SunPower and partner Flextronics opened a 75 MW solar panel manufacturing facility in California. The plant will produce panels for several solar projects, including the California Valley Solar Ranch.

Construction is expected to start on the solar farm in the second half of 2011, subject to permitting and financing. A portion of the plant is expected to come online by the end of 2011 with the rest beginning operations in 2012 and 2013.

Read more solar energy news

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...