Petronas reports first LNG production from Satu

Malaysia’s Petronas reported the start of LNG production from its first floating LNG (FLNG) facility offshore Sarawak.

Natural gas comes to the Satu FLNG facility from the KAKG-A central processing platform in Kanowit field (OGJ Online, Nov. 17, 2016). The gas is treated and liquefied by the Satu’s nitrogen-based liquefaction unit.

The Satu facility is expected to reach commercial operations in first-quarter 2017. At 365 m in length, the Satu has a processing capacity of 1.2 million tonnes/year.

It is designed to maximize the potential of remote and stranded gas reserves.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...