Sembcorp Marine delivers jack up for Culzean development in UK North Sea

Sembcorp Marine AS said it has delivered the high-specification Maersk Highlander jack up drilling rig to Maersk Higher UK Ltd.

The harsh-environment jack up, formerly known as the Hercules Highlander, is scheduled to be deployed in Culzean field in the UK North Sea. Production is expected in 2019. Maersk Oil is the operator.

The Maersk Highlander was designed to operate in 400 ft of water and drill to 30,000 ft. The rig’s construction started in September 2014 and was completed on schedule.

Culzean is a high-pressure, high-temperature field discovered in 2008 on Block 22/25 and appraised during 2009-11 (OGJ Online, Jan. 30, 2009).

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...