Pemex lets contract for Abkatun-A2 platform

Pemex Exploracion y Produccion has let a $454-million contract to McDermott International Inc. for the engineering, procurement, construction, and installation of the Abkatun-A2 platform.

The platform will be installed in 124 ft of water in the Bay of Campeche and will provide replacement and expansion capabilities to the existing Ku-Maloob-Zaap, Cantarell, and Ayatsil facilities (OGJ Online, Jan. 5, 2015).

McDermott will manufacture the structures at its facility in Altamira, Tamaulipas state, Mexico. Engineering and procurement activities will begin immediately, with fabrication scheduled to begin late this year. Offshore activities are scheduled for 2018, with handover to Pemex in fourth quarter 2018.

McDermott is expected to use the Derrick Barge 50 and the Intermac 650, the world’s second-largest float-over installation vessel.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...