Culzean wellhead jacket, access deck complete

The wellhead jacket and access deck for Culzean high-pressure, high-temperature gas and condensate field have begun moving to their destination in the central UK North Sea (OGJ Online, Sept. 1, 2015).

Heerema Fabrication Group completed the jacket at Vissingen, the Netherlands, and the access deck at Hartlepool, the UK, for operator Maersk Oil North Sea UK Ltd.

Together, the units weigh 7,100 tons. The jacket has a height of 114 m.

Water depth at the field, on Block 22/25a 250 km east of Aberdeen, is 88 m.

The development involves bridge-linked wellhead, central processing, and utilities and quarters platforms. Production is to reach 60,000-90,000 boe/d.

Maersk’s partners are JX Nippon and BP PLC.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...