KMG EP plans appraisal wells in flank of S. Nurzhanov field

JSC KazMunaiGas Exploration Production (KMG EP) is planning to drill two appraisal wells in the northeastern flank of the S. Nurzhanov field.

The northeastern flank is separated from the main producing field by a fault system of more than 180 m, the company said.

A directional well in 2015 flowed at a rate of 900 b/d of light crude oil on a 7-mm choke from a Triassic reservoir. The appraisal wells will be drilled in 2016-17 to identify new deposits, estimate reserves, and prepare for trial production in 2018.

S. Nurzhanov has been producing since 1963.

Separately, KMG EP said exploration well PR-3 in the Liman block tested the subsalt Permotriassic reservoir and had a natural oil flow rate of 20 b/d. The company plans to drill four exploration wells this year, make a preliminary reserves estimate, and prepare for trial production in 2017-18.

The company also said an exploration well adjacent to the Akkuduk field flowed at a rate of as much as 110 b/d from a deposit in the Middle Jurassic. Two appraisal wells are planned in 2016-17.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now


Making DDoS Mitigation Part of Your Incident Response Plan: Critical Steps and Best Practices

Like a new virulent strain of flu, the impact of a distributed denial of service (DDoS) attack is...

The Multi-Tax Challenge of Managing Excise Tax and Sales Tax

To be able to accurately calculate multiple tax types, companies must be prepared to continually ...

Operational Analytics in the Power Industry

Cloud computing, smart grids, and other technologies are changing transmission and distribution. ...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...