Woodside lets Greater Western Flank subsea contract

Woodside Petroleum Ltd. has let a $180-million contract to FMC Technologies for the design, manufacture, and supply of subsea production systems for the Greater Western Flank Phase 2 (GWF-2) project on the North West Shelf offshore Western Australia.

The GWF-2 project was granted approvals last month (OGJ Online, Dec. 11, 2015).

GWF-2 is expected to develop 1.6 tcf of raw natural gas from six fields using subsea infrastructure and 35 km of 16-in. pipeline connecting to the existing Goodwyn A platform.

FMC will deliver subsea production trees, wellheads, manifolds, subsea, and topside controls as well as flow line connection systems. Deliveries of these components will begin this year and continue through 2018.

GWF-2 is scheduled to come on stream in 2019.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...