Husky Energy reports unplanned maintenance at Lloydminster upgrader

Husky Energy Inc. reported unplanned maintenance at its Lloydminster heavy oil upgrader in Saskatchewan.

The company said upgrader operations have been suspended, but upstream heavy oil production will not be impacted. An independent assessment conducted in late 2014 hiked Husky’s heavy oil resources in the Lloydminster region of Alberta and Saskatchewan (OGJ Online, Dec. 12, 2014).

The maintenance, which is expected to last 6-8 weeks, is focused on repairs to the facility’s coke drums, Husky said.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...