Second production well online at Prirazlomnoye field in Pechora Sea

JSC Gazprom Neft said a second well has been brought on production in Prirazlomnoye field in the Pechora Sea. The well extends more than 4,500 m.

The company said output at Prirazlomnoye totals 1,800 tonnes/day of oil. Commercial production began in December 2013, and the field produced 300,000 tonnes of oil in 2014.

The field, 60 km offshore, is expected to have 19 production wells, 16 reinjection wells, and one absorption well (OGJ Online, Sept. 15, 2014).

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...