CNOOC starts oil production from Luda 10-1 adjustment project

CNOOC Ltd. said its comprehensive adjustment project at Luda 10-1 oil field has started production in the Liaodong Bay area of Bohai Gulf (OGJ Online, Oct. 23, 2013).

CNOOC added one wellhead platform in 30 m of water. Current production is 3,300 b/d from 13 wells, and peak production of 6,000 b/d is expected in 2016.

CNOOC has 100% interest and serves as operator (OGJ Online, June 30, 2015).

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...