Vaalco spuds exploration well offshore Gabon

Vaalco Energy Inc. has spudded an exploration well in the Dimba prospect about 7 miles northeast of the Etame field offshore Gabon.

The well was drilled by KCA Deutag’s Ben Rinnes jack up rig in 175 ft of water. The well will evaluate both the Gamba and deeper syn-rift formations, Vaalco said. The rig also will be used to re-drill the S. Tchibala 1-H well that experienced a casing failure in early 2013, and to perform a workover of the Avouma 2-H well to replace a failed submersible pump assembly.

The Etame Maritn block is undergoing construction on schedule on two production platforms for additional development. Vaalco expects one platform to be installed in the Etame field and the second platform to be installed between the Southeast Etame and North Tchibala fields in this year’s second half.

The company has scheduled for March a 6-day shutdown of the Etame Marin block to upgrade the safety systems and perform general maintenance and repairs on Vaalco’s leased floating production, storage, and offloading vessel. Vaalco will compensate for the FPSO outage by performing maintenance in the field.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...