Vaalco spuds exploration well offshore Gabon

Vaalco Energy Inc. has spudded an exploration well in the Dimba prospect about 7 miles northeast of the Etame field offshore Gabon.

The well was drilled by KCA Deutag’s Ben Rinnes jack up rig in 175 ft of water. The well will evaluate both the Gamba and deeper syn-rift formations, Vaalco said. The rig also will be used to re-drill the S. Tchibala 1-H well that experienced a casing failure in early 2013, and to perform a workover of the Avouma 2-H well to replace a failed submersible pump assembly.

The Etame Maritn block is undergoing construction on schedule on two production platforms for additional development. Vaalco expects one platform to be installed in the Etame field and the second platform to be installed between the Southeast Etame and North Tchibala fields in this year’s second half.

The company has scheduled for March a 6-day shutdown of the Etame Marin block to upgrade the safety systems and perform general maintenance and repairs on Vaalco’s leased floating production, storage, and offloading vessel. Vaalco will compensate for the FPSO outage by performing maintenance in the field.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...