Second-phase work starts on Halfaya field

A group led by PetroChina Co. Ltd. has begun work on the second phase of development of giant Halfaya oil field in Iraq, reports PetroChina parent China National Petroleum Corp.

The first phase, which started up in June 2012, is producing 100,000 b/d of crude oil and 2.6 million cu m/day of natural gas (OGJ Online, June 27, 2012).

The second phase includes the drilling of 60 wells, laying of a 272-km trunk pipeline, and construction of a 5 million tonne/year crude processing center. The project, to be operational in the second quarter of 2014, will add 200,000 b/d of production.

Total production is to reach 600,000 b/d when the third phase is complete at the end of 2016, CNPC said.

PetroChina’s partners are Total E&P Iraq, Petronas Carigali, and South Oil Co.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...