Pliocene gas gauged at Mnazi Bay, Tanzania

By OGJ editors

Maurel & Prom, Paris, has plugged the Ziwani-1 wildcat on the Mnazi Bay concession onshore Tanzania after it tested natural gas from a Pliocene limestone, said partner Wentworth Resources Ltd., Dar es Salaam.

Drilled to 2,671 m, Ziwani-1 drillstem tested at an unstable 7.2 MMscfd of gas with as much as 973 psi wellhead pressure on a 36/64-in. choke from a clean limestone at 1,106-09 m with 17% porosity and 78% hydrocarbon saturation. The zone has not been previously encountered on the block, and test data analysis indicate potential resource volumes to be noncommercial.

The well also penetrated several Oligocene-Eocene sandstone intervals, but logs indicate them to be water-bearing.

The rig will move to work over and perform extended well tests on the MB-2, MB-3, and MS-1X wells in Mnazi Bay gas field. Then the group will use it to drill a second exploratory well on the concession (OGJ Online, Feb. 3, 2012).

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...