Petrobras starts Santos presalt 6-month well test

By OGJ editors

Petroleo Brasileiro SA (Petrobras) has hooked up the RJS-647 presalt well for a 6-month test in the Iracema area of the BM-S-11 concession in the Santos basin offshore Brazil.

The Cidada de Sao Vicente floating production, storage, and offloading vessel (FPSO) is connected to the well in 2,212 m of water where it will operate for 6 months gathering technical information to support development of a final production system expected to be in operation by the end of 2014 using the 150,000 b/d-capacity Cidade de Mangaratiba FPSO.

Test rates are expected to be about 10,000 b/d of oil, constrained by facilities.

Petrobras has 65% interest in the block. BG Group has 25%, and Petrogal Brasil SA has 10%.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...