Libya: Eni details field production restart timetable

By OGJ editors

Italy’s Eni SPA said it has stepped up efforts to fully resume Libyan oil production and gas exports through the Greenstream pipeline and targets a return to the precrisis 280,000 b/d of oil equivalent by the second half of 2012.

Eni has brought its Libyan output back to 240,000 boe/d.

The company restarted oil production at Wafa and Bu Attifel fields in September 2011, turned on Wafa gas field with reopening of Greenstream in October, resumed output of the Sabratha gas platform at Bahr Essalam field via Greenstream in November, and recommenced El Feel (Elephant) and Bouri oil fields the same month.

The company on Dec. 20, 2011, notified its counterpart in the Libyan petroleum contracts, National Oil Corp., of the termination of the April 2011 declaration of force majeure.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...