Kazakhstan: Doris-6 well encounters hydrocarbons

By OGJ editors

Tethys Petroleum Ltd. said drilling and log data indicate that the Doris AKD06 appraisal well in Kazakhstan encountered oil in the Cretaceous sandstone and Jurassic limestone reservoirs.

The Cretaceous sandstone was encountered above prognosis and at a higher elevation than in the AKD01 Doris discovery well and is of good quality with similar net pay thickness to AKD01, which flowed more than 5,400 b/d of oil from this unit.

The Jurassic limestone was also encountered above prognosis and slightly higher than in the AKD01 well and has similar character to the recently drilled AKD05 well that flowed more than 1,500 b/d of oil from this zone.

Production liner has been set, and more geophysical data will be obtained to tie the well into the new 3D seismic dataset. The well will then be cconnected to the test production facility and two production tests are planned on the reservoir units. Testing should begin within a month.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...