Colombia: Putumayo rework lifts Villeta oil output

By OGJ editors

Emerald Energy PLC improved oil production by reworking the Mirto-1 well on the Maranta block in Mirto field in the Putumayo basin in Colombia, said La Cortez Energy Inc., Bogota.

The workover had the objective of initiating a long-term production test on the Villeta N sand, the same zone that is producing in the Mirto-2 well.

The rework boosted output to 334 b/d of 15° gravity oil with 1.5% BS&W on an electric submersible pump with 820 psi flowing pressure at the ESP inlet, the expected pressure needed to maintain current production levels, La Cortez Energy said. On Sept. 10 production rose to 343 b/d with 0.5% BS&W.

Mirto-2 has averaged 484 b/d of oil with 0.7% BS&W for the year with flow pressure stable at 1,065 psi, indicating the potential to increase the ESP frequency in order to maintain production levels closer to 500 b/d.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...