Albania: Patos-Marinza steam pilot injection nears

By OGJ editors

Patos-Marinza heavy oil field in Albania is producing 13,400 b/d of oil, and steam injection is to start in the last quarter of 2011 at a pilot thermal program in the southwest part of the field.

Of the 1,750 b/d of reported shut-in production in early July, 800 b/d is back on production and the additional oil inventory available for sale June 30 was sold during the month of July, reflecting record sales of 494,000 bbl. The oil brings Brent price, lately at a 27% premium to West Texas Intermediate crude.

A new service rig was delivered in early August, and another is due for delivery in October.

The vertical delineation well is drilling near total depth. Several cores have been cut, and the rig will spud the first of two horizontal thermal wells once casing has been set in the delineation well. The horizontal wells are targeting the thick Driza 1 sandstone, where visual core inspection shows the zone to have excellent porosity and to be fully saturated with oil.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...