Kenya: Block 3B seismic survey to start

By OGJ editors
HOUSTON, June 2
– Vanoil Energy Ltd., Vancouver, BC, let a $3.5 million contract to Bureau of Geophysical Prospecting for 373 line-km of 320-fold 2D seismic on Kenya Block 3B.

The objective is to delineate more leads and to upgrade three known leads to possible drillable targets. The survey is to be complete by the end of September. Interpreted data from Vanoil’s 2010 program is expected within weeks. Vanoil plans to shoot further 3D seismic in the third quarter of 2011.

Vanoil holds 100% interest in blocks 3A and 3B that total 24,682 sq km in the Cretaceous Central African Rift Basin System.



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...