BP, Technip spar pact includes Mad Dog work

By OGJ editors
HOUSTON, May 3
-- BP Exploration & Production Inc. has entered an agreement with Technip for spar technology covering a second phase of development of Mad Dog oil and gas field.

The 10-year master agreement covers design, procurement, and construction of hulls and mooring systems for spars to be installed in the Gulf of Mexico. It also covers design of top tension risers and dry tree units.

Technip said the agreement includes pre-front end engineering design for the Mad Dog Phase 2 spar. That work has begun. Front-end engineering design for the project is to begin in this year’s second half.

Mad Dog produces through a truss spar moored in 4,500 ft of water on Green Canyon Block 782 about 100 miles south of Grand Isle, La., with capacity to process 80,000 b/d of oil and 60 MMcfd of gas.

Since placing the field on production in 2005, BP has appraised a southern extension in 5,100 ft of water (OGJ, July 26, 2009, Newsletter).

BP holds a 60.5% working interest in Mad Dog. Other partners are BHP Billiton 23.9% and Chevron Corp. 15.6%.



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...