Enable Midstream begins binding open season for Cana and STACK expansion

Enable Midstream Partners LP’s (NYSE: ENBL) wholly owned subsidiary Enable Gas Transmission LLC (EGT), will conduct a binding open season to solicit commitments for EGT’s Cana and STACK expansion (CaSE) project.

Together with existing EGT system capacity and EGT capacity on third-party pipelines, the CaSE project will provide residue takeaway solutions for growing production from the Cana Woodford play, as well as the Sooner Trend, Anadarko, Canadian, and Kingfisher “STACK” region. EGT is positioned to provide scalable and flexible solutions for firm transportation service to access premium Southeast and Western markets. The proposed project provides transport options for volumes between 190,000 dth/d and 490,000 dth/d.

The binding open season is scheduled to end at 5 p.m. (CT) on Dec. 3.



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...