Southcross completes NGL pipelines, updates on Eagle Ford fractionator

Southcross Energy Partners LP (NYSE: SXE) has completed a 60,000-bbl/d Y-grade pipeline connecting Southcross’ Woodsboro processing facility to Southcross Holdings LP’s 63,000-bbl/d Robstown fractionator near Corpus Christi, Texas, and a 20,000-bbl/d propane pipeline from Southcross’ Bonnie View fractionator to the Corpus Christi area for delivery to end-use customers (collectively, the NGL Pipelines).

The NGL Pipelines were part of the drop-down transaction announced in May with construction expected to be completed in July. In addition, the first of the two fractionation trains at Robstown is operating at 32,000 bbl/d of Y-grade. The second fractionation train at Robstown is in the commissioning phase and remains on target to be operational by August.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...