EnLink Midstream extends open season for pipeline project

The EnLink Midstream companies, EnLink Midstream Partners LP (NYSE: ENLK) and EnLink Midstream LLC (NYSE: ENLC), have extended the binding open season period to solicit volume commitments for interstate common carrier transportation service on a new condensate pipeline system (the ORV Condensate Pipeline). The open season, which was scheduled to end Feb. 27, has been extended to end on April 15 at 5 p.m. Central Time.

EnLink has received interest for participation in the ORV Condensate Pipeline and is extending the open season. The ORV Condensate Pipeline will transport condensate from points in Harrison, Belmont, Guernsey, Noble, Monroe, and Washington counties, Ohio, to Bells Run Station in Washington County, Ohio; Black Run Station in Muskingum County, Ohio; and, if Ohio River Valley Pipeline LLC elects to construct extension(s) of its system, to one or more connecting facilities in Holmes, Coshocton, and Harrison counties, Ohio.

The design capacity of the ORV Condensate Pipeline will be dependent upon the level of interest shown by potential committed shippers during the open season.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...