Medallion begins operations of Permian crude oil system

Medallion Pipeline Co. LLC

Medallion Pipeline Co. LLC, a subsidiary of Medallion Midstream LLC, has begun operations of 97 miles of its Midland Basin crude oil gathering and transportation system. On Oct. 10, Medallion began initial deliveries of crude oil into the BridgeTex Pipeline from its 60-mile Wolfcamp Connector pipeline and 37 miles of its Reagan Gathering Extension pipeline.

The Medallion system has initial capacity to accept 65,000 barrels per day of crude oil and is scalable to 150,000 barrels of oil per day. An open season for capacity on both pipelines was closed on Feb. 3. Medallion expects the remaining portion of its Reagan Gathering Extension, along with truck unloading stations at its Reagan Station and Garden City Station, to be operational by year's end.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...