Wood Group Mustang to do FEED services for Hess' Stampede TLP

Wood Group Mustang

Wood Group Mustang has a contract to provide front-end engineering design (FEED) services for Hess Corp.'s Stampede tension leg platform (TLP) to be located in 3,500 ft (1,067 m) of water in the Gulf of Mexico’s Green Canyon block.

The TLP, with a dry topsides weight of 11,500 tons, is being designed to produce 80,000 bpd of oil, 60,000 bpd of water, and 120 mmscfd of gas at capacity.

Wood Group Mustang has also provided FEED and detailed design for Hess' Okume production facilities, located offshore Equatorial Guinea, which consisted of four fixed platform facilities with connecting bridges, two TLPs, and associated pipelines.



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...