CNOOC starts up new wells at Penglai oil field

Offshore staff

HONG KONGCNOOC has started production from the Penglai 19-9 comprehensive adjustment project in the Bohai area offshore China.

The Penglai 19-9 oil field is in an average water depth of around 30 m (98.4 ft). The adjustment project involved adding one new wellhead platform, tied into the existing facilities.

CNOOC plans to drill 57 production wells: two are currently in service, producing roughly 750 b/d of crude oil.

The adjustment project should reach peak production of around 13,000 b/d during 2019.

CNOOC Ltd. has 51% operated interest in Penglai 19-9 oil field, in partnership with ConocoPhillips China that holds the remaining 49% working interest.

01/12/2017

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...