Lamprell hands over second Ensco jackup

Offshore staff

SHARJAH, UAELamprell has delivered the newbuild jackup Ensco 141 to Ensco Intercontinental.

The two parties signed the construction contract in April 2014: this is the second jackup of the LeTourneau Super 116E (Enhanced) Class design that Lamprell has supplied to Ensco.

For the time being the rig will be warm-stacked alongside its sister jackup at Lamprell’s stacking facility in Hamriyah, UAE.

Four more newbuild jackups are under construction at Hamriyah, all progressing as planned and will be delivered over the next six months.

11/04/2016

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...