Trelleborg delivers floatover components for Petronas platform

Offshore staff

SINGAPORETrelleborg has completed the supply of floatover equipment for Petronas’ NC3 gas field in block SK316, 200 km (124 mi) north of Bintulu, Sarawak.

The contractor provided PAPE Engineering, the company responsible for transportation and installation of the platform jacket and topsides, with four leg mating units (LMUs), four sway fenders, four loadout pads, and four deck support units.

Olivier Beauclair, director for platform transportation and installation at PAPE, said:  

“In addition, Trelleborg site service engineers were able to provide supervised on-site support, ensuring a seamless LMU installation within the topside of the Central Processing Platform.”

The LMU installation was performed at the fabrication yard prior to the floatover process.

10/18/2016

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...