Huisman wins further crane order for Heerema construction vessel

Offshore staff

SCHIEDAM, the NetherlandsJurong Shipyard has contracted Huisman China to provide a 100-metric ton (110-ton) pedestal mounted offshore crane for installation onboard Heerema’s new semisubmersible crane vessel Sleipnir.

Delivery is scheduled for March 2018. 

This will be an auxiliary crane to two 10,000-metric ton (11,023-ton) cranes, also designed and constructed by Huisman.

Features include the Huisman enclosed crane house design claimed to provide reduced maintenance, high speeds, and extensive integration with the vessel systems.

10/27/2016

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...