Harvey Gulf tug barge receives approvals

Offshore staff

NEW ORLEANS Harvey Gulf International Marine (HGIM) has received both ABS-class functional approval and United States Coast Guard design bases approval on a 4,000 cu m (141,258 cu ft) LNG articulating tug barge construction drawing package.

The design accounts for ship-to-ship transfer and shore-side resupply transfers.

Working with design partner Waller Marine in conjunction with ABS and USCG, the company said it had developed the design package ahead of construction, minimizing the potential for delays and cost impacts to the project during construction.

HGIC said it was committed to the domestic LNG marine market, delivering what it says is the first US vessel to use LNG as a marine fuel, Harvey Energy, as well as the development and operation of another claimed US first, the Port Fourchon, Louisiana LNG marine refueling terminal.

09/13/2016

Share your news with Offshore at news@offshore-mag.com

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Making DDoS Mitigation Part of Your Incident Response Plan: Critical Steps and Best Practices

Like a new virulent strain of flu, the impact of a distributed denial of service (DDoS) attack is...

The Multi-Tax Challenge of Managing Excise Tax and Sales Tax

To be able to accurately calculate multiple tax types, companies must be prepared to continually ...

Operational Analytics in the Power Industry

Cloud computing, smart grids, and other technologies are changing transmission and distribution. ...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...