Fendercare delivers TEN FPSO export hose package

Offshore staff

SEETHING, UK – Fendercare Marine has completed a floating hose contract for Tullow Oil’s deepwater TEN project offshore Ghana.

This involved assembly, testing, and installation of a floating export hose system, contracted by MODEC for the FPSO Prof. John Evans Atta-Mills.

The package included 20-in. Yokohama Seaflex floating hoses, a floating Y piece, 16-in. Seaflex floating hoses, and tanker rail hoses.

All three TEN fields are in the Deepwater Tano contract area in a water depth averaging 1,500 m (4,921 ft).

09/23/2016

Share your news with Offshore at news@offshore-mag.com

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...