Woodside commits to Greater Enfield subsea tiebacks

Offshore staff

PERTH, AustraliaWoodside Energy and Mitsui E&P Australia have sanctioned the $1.9-billion Greater Enfield development offshore Western Australia.

The project is targeting 69 MMboe from the Laverda Canyon, Norton over Laverda, and Cimatti oil accumulations, 60 km (37 mi) offshore Exmouth.

All will be produced via a 31-km (19-mi) subsea tieback to the FPSO Ngujima-Yin serving the Vincent oil field. First oil is targeted for mid-2019.

Woodside CEO Peter Coleman said breakthroughs in technology and contracting collectively allowed the program to go forward.

“We have achieved investment spend at the low end of our guidance range…This allows us to accelerate the development of previously stranded resources,” he added.

Greater Enfield calls for six subsea production wells and six water injection wells. Production will be supported by subsea multiphase booster pumps in the Laverda area and gas lift in the Cimatti area.

06/27/2016

Share your news with Offshore at news@offshore-mag.com

Greater Enfield development offshore Western Australia
(Map courtesy Woodside)

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...