PEMEX commissions McDermott for Abkatun-A2 platform fabrication, installation

Offshore staff

HOUSTON – McDermott International Inc. has received a $454-million contract from PEMEX Exploracion y Produccion to engineer, procure, construct, and install (EPCI) the Abkatun-A2 platform in 124 ft (38 m) of water in Mexico’s Bay of Campeche.

McDermott will provide a vertically integrated, turnkey EPCI solution to build and commission the platform and associated structures using its project management and engineering team in Mexico.

The platform will provide replacement and expansion capabilities to the existing Ku-Maloob-Zaap, Cantarell, and Ayatsil facilities.

Engineering and procurement activities will commence immediately with fabrication scheduled to begin in late 2016 at the Altamira, Mexico fabrication facility followed by offshore activities in 2018. The company is expected to use the Derrick Barge 50 and the Intermac 650, the world’s second largest float-over installation vessel. Handover to PEMEX is scheduled for 4Q 2018.

This is McDermott’s largest project in size and total value to-date for PEMEX.

06/27/2016

Share your news with Offshore at news@offshore-mag.com

McDermott's Altamira, Mexico fabrication facility
The successful load out of the PB Litoral A project at the Altamira, Mexico fabrication facility. (Photo courtesy McDermott)

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Making DDoS Mitigation Part of Your Incident Response Plan: Critical Steps and Best Practices

Like a new virulent strain of flu, the impact of a distributed denial of service (DDoS) attack is...

The Multi-Tax Challenge of Managing Excise Tax and Sales Tax

To be able to accurately calculate multiple tax types, companies must be prepared to continually ...

Operational Analytics in the Power Industry

Cloud computing, smart grids, and other technologies are changing transmission and distribution. ...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...