Oman Oil completes offshore oil loading operation

Offshore staff

DUBAI, UAEMarsol International has supported Oman Oil Co. Exploration & Production’s (OOCEP) first shipment of crude oil from the Musandam gas plant.

The contractor was responsible for all marine and offshore activities related to the tanker loading via the single point mooring (SPM) offshore marine terminal, including marine works, vessels, equipment, and manpower.

OOCEP safely exported 300,000 bbl of crude oil under the operation, which were fully processed at the Musandam gas plant on May 4.

Mike Young, Marsol’s director, said: “Our tanker operations and our product transfer services ensure safe and efficient mooring and unmooring at the SPM and are a crucial element of our asset integrity management service.”

The Musandam gas plant is on the west coast of the Musandam peninsula. It has a daily processing capacity of up to 20,000 bbl of crude; 45 MMcf of gas; and 75 metric tons (82.7 tons) of LPG.

06/29/2016

Share your news with Offshore at news@offshore-mag.com

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...