Gazprom expects more wells to come online at Kirinskoye offshore Sakhalin

Offshore staff

MOSCOWGazprom expects to double the current number of subsea production wells this year at its Kirinskoye field offshore Sakhalin Island to four.

By 2019, seven wells should be in operation, with annual gas production potentially reaching 5.5 bcm.

Kirinskoye, which came onstream in 2014, is part of the Sakhalin III project. Here, Gazprom has completed its geological exploration over the boundaries of the Yuzhno-Kirinskoye field.

The company added that is design documentation is under development for construction of a third production train at the LNG plant serving the offshore Sakhalin II project.

Current annual capacity is up to 5.4 MM tons of LNG.

06/16/2016

Share your news with Offshore at news@offshore-mag.com

Sakhalin III
(Map courtesy Gazprom)

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...