Schiehallion floater docks in western Norway

Offshore staff

HAUGESUND, NorwayBP has contracted Aibel to provide a yard stay and assistance with final preparations of the Glen Lyon FPSO, due to serve the Quad204 project west of Shetland.

The 270-m (886-ft) long, 52-m (170-ft) wide FPSO is the largest ever to dock at Aibel Haugesund, where it will likely remain for the next two months. This will be the FPSO’s final stop on its journey toward the Schiehallion field.

Aibel will assist BP with Glen Lyon’s final preparations, providing assorted marine operations and fabrication activities, also cooperating in a function test of a mechanical winch.

05/03/2016

Share your news with Offshore at news@offshore-mag.com

Glen Lyon FPSO
(Courtesy BP)

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...