KrisEnergy completes Wassana development drilling offshore Thailand

Offshore staff

SINGAPORE – Development drilling has been completed in the Wassana oil field in the G10/48 license offshore Thailand, according to KrisEnergy.

Thirteen producer wells and one water disposal well are onstream. Production at the Wassana field reached a peak of 12,800 b/d of oil during 1Q.

Elsewhere in the Gulf of Thailand, the company says production through the B8/32 and B9A oil and gas complex was boosted by an increase in wireline zonal recompletions.

Oil production averaged 29,240 b/d in 1Q and gas production has held steady at 148 MMcf/d, the highest since June 2012.

Five new development wells were drilled last month and two more this month.

05/13/2016

Share your news with Offshore at news@offshore-mag.com

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...