Final Cat D rig close to departure for Norway

Offshore staff

LIMASSOL, CyprusSonga Offshore has taken delivery of Songa Enabler from Daewoo Shipbuilding & Marine Engineering in South Korea.

This is the last in a series of four Category D semisubmersible rigs built for and contracted to Statoil for programs offshore Norway.

Songa Enabler will sail to Norway to start an eight-year drilling contract with Statoil, with the first assignment this summer on the Snøhvit field in the Barents Sea.

The transit will take place with tow-assist and the rig will arrive in Norway with all third-party equipment installed and ready for the client’s final acceptance testing.

As with the earlier deliveries, Songa Enabler is a sixth-generation, harsh environment, fully winterized, midwater rig designed for year-round drilling, completion, testing and intervention operations in water depths up to 500 m (1,640 ft).

It is certified DP-3, and according to Songa features a “state-of-the-art” drill floor and efficient layout providing an improved working environment.

03/31/2016

Share your news with Offshore at news@offshore-mag.com

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...