Jumbo’s Fairmaster brings VLS to Normand Maximus

Offshore staff

SCHIEDAM, the Netherlands Jumbo’s M/V Fairmaster has transported a 1,720-metric ton (1,895-ton) vertical lay system (VLS) from La Rochelle, France to Brattvåg, Norway.

The VLS was delivered to La Rochelle from Poland in July 2015 by M/V Jumbo Jubilee and was fully assembled in six months. It arrived to its destination in January 2016: Saipem’s subsea construction vessel Normand Maximus.

Upon arrival at the Port of Brattvåg, Fairmaster moored alongside the newly built hull and placed the VLS and its foundation successfully onboard Normand Maximus in winter conditions.

The VLS measures 32 x 16 x 44 m (104 x 52 x 144 ft) and was 876 metric tons (965 tons) before assembly.


Share your news with Offshore at news@offshore-mag.com

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now


Making DDoS Mitigation Part of Your Incident Response Plan: Critical Steps and Best Practices

Like a new virulent strain of flu, the impact of a distributed denial of service (DDoS) attack is...

The Multi-Tax Challenge of Managing Excise Tax and Sales Tax

To be able to accurately calculate multiple tax types, companies must be prepared to continually ...

Operational Analytics in the Power Industry

Cloud computing, smart grids, and other technologies are changing transmission and distribution. ...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...