Trelleborg unveils FPSO seal inspection chamber

Offshore staff

BARENDRECHT, the NetherlandsTrelleborg Sealing Solutions has opened a climate-controlled swivel stack seal inspection facility for validation of bespoke seals.

It is designed to help ensure FPSO operators achieve high standards in seal quality, the company says.

The facility provides a temperature-controlled environment to avoid fluctuations in the dimensions of the seals caused by temperature changes, with specialist storage racks allowing the seals to be acclimatized prior to inspection.

Seals up to 3,000 mm (118-in.) can be measured on a specially designed inspection table, with special lighting to aid visual inspection.


Share your news with Offshore at

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now


Making DDoS Mitigation Part of Your Incident Response Plan: Critical Steps and Best Practices

Like a new virulent strain of flu, the impact of a distributed denial of service (DDoS) attack is...

The Multi-Tax Challenge of Managing Excise Tax and Sales Tax

To be able to accurately calculate multiple tax types, companies must be prepared to continually ...

Operational Analytics in the Power Industry

Cloud computing, smart grids, and other technologies are changing transmission and distribution. ...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...