Statoil mobilizes Songa Delta for North Sea Oseberg area well

Offshore staff

OSLO, Norway – Statoil has Petroleum Safety Authority Norway’s consent to drill an exploration well 28 km (17.4 mi) south of the Oseberg field in the North Sea.

The semisubmersible Songa Delta is expected to spud well 30/11-1 in mid-January, with drilling potentially lasting up to 36 days. Water depth at the site is around 106 m (348 ft).

Statoil has awarded two new long-term contracts with a combined value of around NOK11 billion ($1.23 billion) for insulation, scaffolding and surface treatment services.

Beerenberg Corp. AS and Prezioso Linjebygg will provide these services to 20 of the company’s 29 installations on the Norwegian continental shelf and its Norwegian onshore plants over a 15-year period.

These deals replace existing contracts with the two suppliers. Statoil also plans to extend contracts at some point with Bilfinger Industrier and Kaefer Energy.

01/05/2016

Share your news with Offshore at news@offshore-mag.com

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...