ABS Group to develop maintenance strategy for Golar FLNG fleet

Offshore staff

ABS Group subsidiary Genesis Technology Solutions Inc. has received a contract by Golar LNG to develop an intelligent maintenance strategy for the company’s new fleet of floating LNG (FLNG) vessels using the GoFLNG floating liquefaction technology.

As part of a fleet-wide maintenance strategy to address the safety and reliability of FLNG assets and activities, ABS Group will assist Golar LNG with implementing the Maximo computerized maintenance management system to support its asset management program.

The company will provide a model for asset data, criticality rankings, spare parts analysis, a risk-based inspection strategy, failure mode, and effects analysis and a maintenance program for the first GoFLNG facility under construction at Keppel Shipyard in Singapore, Hilli, which will operate offshore Cameroon, as well as for future vessels. It is expected that production will commence in 2Q 2017.

Golar LNG has been developing the GoFLNG project for the past two years.


Share your news with Offshore at news@offshore-mag.com

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now


Making DDoS Mitigation Part of Your Incident Response Plan: Critical Steps and Best Practices

Like a new virulent strain of flu, the impact of a distributed denial of service (DDoS) attack is...

The Multi-Tax Challenge of Managing Excise Tax and Sales Tax

To be able to accurately calculate multiple tax types, companies must be prepared to continually ...

Operational Analytics in the Power Industry

Cloud computing, smart grids, and other technologies are changing transmission and distribution. ...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...