SapuraKencana starts work on B15 gas project offshore Malaysia

Offshore staff

KUALA LUMPUR, MalaysiaSapuraKencana Energy (SKE) has approval from Petronas for its development plan for the SK310 B15 gas field offshore Sarawak.

This clears SKE to start the development with a view to achieving first gas during 4Q 2017.

B15 was discovered in December 2010 in the SK310 production-sharing contract area. SKE plans a central processing platform with a 35-km (21.7-mi) gas export pipeline tied into existing infrastructure.

The field should deliver 100 MMcf/d to the Petronas LNG complex in Bintulu, Sarawak.

SKE operates the concession in partnership with Petronas Carigali and Mitsubishi subsidiary Diamond Energy Sarawak.

11/25/2015

Share your news with Offshore at news@offshore-mag.com

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...