Subsea 7 to install subsea network for latest East Nile Delta phase

Offshore staff

LUXEMBOURG – Pharaonic Petroleum Co. has contracted Subsea 7 S.A. for subsea services at the East Nile Delta Phase 3 project (END-3) offshore Egypt. These will be employed for development of the Taurt and Ha’py fields.

The project scope includes installation engineering, procurement, and fabrication of rigid spools; and installation of pipeline, umbilical and subsea structures to develop resources from two wells, including 8 km (5 mi) of umbilicals and pipeline, for water depths of 80-90 m (262-295 ft).

Petrojet will fabricate the spools at its yard in Egypt. Offshore installation is due start in the current quarter using Subsea 7’s Rockwater 2 and Seven Borealis vessels.



Share your news with Offshore at

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now


Making DDoS Mitigation Part of Your Incident Response Plan: Critical Steps and Best Practices

Like a new virulent strain of flu, the impact of a distributed denial of service (DDoS) attack is...

The Multi-Tax Challenge of Managing Excise Tax and Sales Tax

To be able to accurately calculate multiple tax types, companies must be prepared to continually ...

Operational Analytics in the Power Industry

Cloud computing, smart grids, and other technologies are changing transmission and distribution. ...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...